Школы

Новостройка


Structures:           ECBCGroup
Subcontracted by Waterman Group

Scope of work
A major 3 storey high superblock will be constructed at the school.

The building sits on its own substructure. The lowest levels are generally at localised external ground level. 
Due to the highly sloping nature of the site, there is an element of cut-fill to balance ground levels.

The preferred structure type is a concrete flat slab structure with internal columns on a generic grid layout to optimise future flexibility.
The concrete frame was preferred as it offered programme advantages and better thermal mass performance, along with the ability to lose the columns in the cladding thickness. 
The Superblock principle is a repeat of the concept provided at Stratford Academy.